Description
Activity durations retain probabilistic and stochastic natures due to diverse factors causing the delay or acceleration of activity completion. These natures make the final project duration to be a random variable. These factors are the major source of financial risk. Extending the Stochastic Project Scheduling Simulation system (SPSS) developed in previous research; this research presents a method to estimate how the final project duration behaves when activity durations change randomly. The final project cost is estimated by considering the fluctuation of indirect cost, which occurs due to the delay or acceleration of activity completion, along with direct cost assigned to an activity. The final project cost is estimated by considering how indirect cost behaves when activity duration change. The method quantifies the amount of contingency to cover the expected delay of project delivery. It is based on the quantitative analysis to obtain the descriptive statistics from the simulation outputs (final project durations). Existing deterministic scheduling method apply an arbitrary figures to the amount of delay contingency with uncertainty. However, the stochastic method developed in this research allows computing the amount of delay contingency with certainty and certain degree of confidence. An example project is used to illustrate the quantitative analysis method using simulation. When the statistical location and shape of probability distribution functions defining activity durations change, how the final project duration and cost behave are ascertained using automated sensitivity analysis method